What we take after a renovation
Old kitchen units and worktops, bathroom suites, doors and frames, radiators, tiles and plasterboard in small loads, packaging from the new fittings, timber offcuts and the mixed pile every job ends with.
This is for the leftovers of a renovation, not an active building site. Small rubble loads are fine; if you are demolishing a house, a skip is honestly the better tool and we will say so.
The skip alternative
A skip in a Paphos street needs a permit, space and someone to fill it. Our crew arrives, carries everything out from wherever the builders left it — courtyard, hallway, balcony — loads it and leaves the space swept. You pay for the van space used, not for a container that sits half-empty for a week.
Where it goes
Metals go to scrap recycling, timber and packaging to recycling points, the rest to municipal facilities. Asbestos and hazardous materials are not loaded; we point you to the right specialist route.
How to get your quote
Send a photo of the pile and a photo of the access, your area and the date you need it gone. You get a written quote back, usually within 30 minutes (8:00–20:00), and it does not change at the door.
